Q - Z
-
Richmond Playground Renovation
The renovation of the children’s play area at Richmond Playground is part of the Let’sPlaySF! Initiative
-
Schlage Lock - Future Park Sites
As part of the larger Schlage Lock/Visitacion Valley project, a private developer is going to build two new public parks on the former Schlage Lock site.
-
South Sunset Synthetic Turf Replacement Project
Description Synthetic turf was installed at the South Sunset soccer and baseball fields over ten years ago. These fields are at the end of their useful life and are in need of replacement.
-
Stern Grove Emergency Repairs
SFPUC has released a series of emergency contracts to repair damage done to portions of Stern Grove because of a broken air valve on a nearby large water transmission pipeline in August 2021.
-
Stern Grove Playground Renovation
The proposed project includes restoring a children’s playground at the Group Picnic site and removing the old sand areas.
-
Stow Lake Perimeter Path Renovation (Golden Gate Park)
The intent of this project is to renovate the existing perimeter path at Stow Lake and the site furnishings, including benches and picnic tables to achieve ADA compliance
-
Sue Bierman Playground Vandalism Repairs
Repairs to fix damage to the play structure caused by a fire in October 2021
-
Transbay Block 3 Park
Block 3 Park and adjacent Clementina and Tehama alleyways are central features of the Transbay Redevelopment Project Area, which was adopted in 2005 and includes 40 acres of high-density transit-oriented housing, office space and retail in the East Cut, a new neighborhood just south of San Francisco's downtown and financial districts.
-
Twin Peaks Figure 8 Redesign Project
Review information about the Figure 8 Redesign Project.
-
Twin Peaks Trails Improvement Project
Improving the main spine trail, repair existing trails and steps, eliminating social trails, and provide wayfinding signage
-
Victoria Manalo Draves (VMD) Project
The project includes the addition of sports lighting at the ballfield and basketball court and upgrades of pathway lighting, as well as minor security updates to pathways, low walls, and fencing, to create better circulation and site visibility.
-
Yosemite Creek Daylighting Project (McLaren Park)
Rec and Park, in partnership with SFPUC, is daylighting the historic Yosemite Creek in McLaren Park and piloting a high efficiency irrigation/stormwater reuse system at the Louis Sutter playfield