Proposals and Timeline

Ideas to Improve Traffic Safety & Park Access 

Based on the work of the Golden Gate Park Stakeholder Working Group, led by the San Francisco County Transportation Authority, in order to improve access, equity, and mobility, we propose:

ADA ParkingADA Parking
14 new spaces in the Music Concourse


Taxi StandPark Taxi Stand
New stand for taxis and paratransit at the Music Concourse




Park ShuttlePark Shuttle
Upgrade the existing in-park circulator shuttle




PedicabsPedicabs
Permitting pedicab service within the park




Bike and Scooter ShareNew Bike & Scooter Share Services
Install new bike racks and bikeshare docking stations, permitting bikeshare, dockless bikeshare, and scooter share within the park



DROP OFFConcourse Garage
Free-to-use 15-minute drop-off zones and dynamic parking rates


trafficAddressing Congestion
And other challenges at intersections in and near the park



constructionFulton St. Improvements
Loading, transit access, and more ADA parking



Improved WayfindingImproved Wayfinding
To get drivers to the garage and safely through the park



pedestriansRoadway Access
Options

Park roadway changes
to provide access to key destinations while maintaining the park experience



Technical analysis and public input will help decide which streets should be closed to cars post-COVID.


Timeline

After a public outreach process, a program proposal will go to the Board of Supervisors by the end of the 2021, the contents of which will be determined by staff technical analysis and input gathered through the public outreach process.

timeline ggp access and safety

  • Summer-Fall 2021: Public Outreach & Technical Analysis
  • Winter 2021/22: Proposal at Board of Supervisors
  • Spring 2022: Implementation & Evaluation

Share your thoughts with us!