News Flash

RPD Park Improvements: Angelo J. Rossi Pool

Posted on: July 19, 2021

Rossi Pool Project Update 7/19!

Capital Project Update

Project progress is moving along well, and the construction team is working diligently despite some delays due to unforeseen site conditions. Current construction activities include:

Building Envelope – Concrete scope complete. Painting subcontractor is onsite prepping exterior for paint. Asphalt subcontractor recently placed asphalt for tennis courts. General contractor preparing to install new staircase to basement.

Mechanical/Electrical/Plumbing Rough-Ins –Mechanical subcontractor continuing work on pool heating and control systems. Electrical subcontractor continuing work on primary electrical connections and lighting control system. Utility subcontractor recently completed installation of domestic water/fire lines as well as grading along westside of jobsite.

Building Finishes – Specialty coating subcontractor recently completed epoxy floor coating for pool deck showers. Glazing subcontractor nearly complete with door, framing, and glass installation throughout building. General contractor installing wood paneling in lobby.

We anticipate completion of construction in late Fall of 2021.

Concrete sidewalk poured in front of building entrance. Lower brick façade and wall of building.

Exterior of pool building with plastic covering all of the windows and equipment adding concrete.

Construction workers finishing interior pool building. Two showers, white tile wall and black beams.

Interior entrance with black outlined windows over white walls and wood slat ceiling.

Two construction workers with orange vests completing electrical work inside the building.

White interior walls with black trimmed windows and doors with empty pool.