We’re happy to report that the project is two-thirds complete! This includes significant portions of the structure and utilities systems.
Please be advised that we expect limited Saturday construction work in February.
Plaza/Pagoda Work:
- The waterproofing underlayment on the pagoda roof is now complete, and installation of the copper roof will start next month.
- Tensioning and adjusting the steel rods, which were added to reinforce the Pagoda, is now complete.
- Our paint adhesion tests were successful, and we will now begin the process of preparing the Pagoda surface to receive multiple coats of paint.
- Waterproofing work on the plaza continues. We expect some odor during this process, and fans will be in use to help with airflow. We were happy to see that all the areas of the plaza where waterproofing has already been completed performed perfectly during the winter storms!
Garage Work:
- Plumbing/Electrical layout and installation continues.
- Scaffolding and shoring continue in the ramp leading to lower level.
- 60 parking spots under pagoda, in both upper and lower garage levels will be occupied through early 2026. Drive cautiously in the garage and follow posted detours signs on both upper and lower levels. Please do not walk on the ramp between levels.
Access to and throughout Japan Center Malls and Garage:
- Access from Geary Boulevard: Use the Geary Boulevard parking garage to access both East Mall and West Mall.
- Access from Post Street: Use the new posted detours into East Mall adjacent to U.S. Bank and to West Malls adjacent West Mall building.
- Sidewalk: Accessible pedestrian detour is open along the north side of Geary between Laguna to Buchanan Streets. For safety, follow all detours, stay within fenced pedestrian detour lane, and avoid walking in the bus lanes.
💬 Have questions or concerns?
Feel free to contact the project manager:
J. Marien Coss
📧 marien.coss@sfgov.org
📞 628-652-6647