Background
Let’sPlaySF! has its origins in the $195 million San Francisco Clean and Safe Neighborhood Parks General Obligation Bond approved by 71.6% of voters in November 2012. The Bond allocated $15.5 million to renovate dilapidated playgrounds through the City.
In 2014, the Recreation and Park Commission appointed a Citizen Task Force to determine which playgrounds were most in need of renovation. The Task Force prioritized six Tier 1 and seven Tier 2 playgrounds for renovation based on four criteria: (1) the presence of Chromated Copper Arsenate (CCA) Pressure Treated Wood, (2) low Household Median Income, (3) high Youth Density and (4) low Parks Alliance Playground Report Card Grades.
In December 2014, the Recreation and Park Commission unanimously adopted the list recommended by the Task Force, of which the Department committed to renovate all six Tier 1 playgrounds and to renovate some or all Tier 2 playgrounds provided if additional funding were procured. In the wake of that determination, the Department and the Parks Alliance decided to partner on Let’sPlaySF!, a capital campaign dedicated to raising sufficient funds to ensure that all 13 playgrounds can be reimagined for San Francisco’s children. The Parks Alliance Board voted in December 2015 to undertake the campaign and in December of 2016, the Commission approved a MOU between the Parks Alliance and the Department to partner on the project and recommended that the Board of Supervisors accept up to $15 million from the Parks Alliance for the project.
Program Status
The initiative has fully completed 9 of the 13 playgrounds and are open to the public. Of the four remaining playground, Herz Playground is currently in construction. Stern Grove and Richmond are preparing for construction later in 2023. Buchanan Mall Playground has been incorporated into a larger renovation of the park and is currently in design phase. For status updates on the individual sites, click on a project.
Status of Tier 1 Sites - All Tier 1 Sties are completed and open to the public.
- Washington Square Playground
- Panhandle Playground
- Sgt. John Macaulay Park
- McLaren Park - Redwood Grove Playground
- Merced Heights Playground
- Alice Chalmers Playground
Status of Tier 2 Sites:
- West Portal Playground
- Juri Commons
- Golden Gate Heights Park
- Herz Playground
- Richmond Playground
- Buchanan Street Mall
- Stern Grove Playground
For more background and to donate through our partner, visit San Francisco Parks Alliance.
Project Updates
If you would like to sign up for updates click here and scroll down to the NewsFlash and select the alerts you would like to receive.
- Project Update Blog
- Additional Background
- Documents and Materials
- Meeting Materials
- Task Force Members
-
-
SF City leaders, families celebrate groundbreaking of improvement project at Herz Playground
The Recreation & Park Department broke ground on renovations at Herz Playground in Visitacion Valley on Monday as part of the Let’sPlaySF! initiative that is delivering creative play spaces to children across San Francisco. Read on... -
Juri Commons Park Reopens Following Renovation
Juri Commons reopened following a $1.9 million renovation honoring the Mission District park’s railroad history, featuring a redesign with new plantings, an improved play space for children, grass for dogs, & an adult exercise area with fitness equipment. Read on... -
Buchanan Street Mall | Memory Walk design reviews + workforce development meetings this week!
This is a full week for the Buchanan Street Mall Renovations project! The Buchanan Street Mall project team is seeking San Francisco Arts Commission Civic Design Review committee approval on the Read on... -
Last call for the Buchanan Mall Memory Walk survey!
If you haven’t yet, please take 10 minutes to complete the survey before 5pm on this Thursday, 8/10/2023! Read on... -
Buchanan Street Mall Renovations | Healing circles and Memory Walk design
Thanks to everyone who is showing up and participating in summer healing circles. Community gatherings continue every other Read on... -
Buchanan Street Mall Renovations | Join us for Summer Community Gatherings in June, July, and August
Join neighbors and facilitators to continue conversations on healing and transformation in our community Read on... -
Buchanan Street Mall Renovations | Summer Community Gatherings, June-August
Join neighbors and facilitators to continue conversations on healing and transformation in our community Read on... -
Buchanan Street Mall | May Community Gatherings focus on the Memory Walk
Thanks to everyone who has participated in healing circles over the past several weeks as part of the Buchanan Street Mall Equity Action Initiative Read on... -
UPDATED! - Buchanan Mall Equity in Action April Gatherings
Community gathering scheduled for April 5 is now cancelled. Please join us for the next meeting, scheduled for April 19. Be a part of the Read on... -
Buchanan Mall Equity in Action April Gatherings!
Join our April Equity in Action gatherings Read on... -
Community Gathering on March 22 | Buchanan Street Mall – Park Improvement Equity Action Initiative
Join Us for the Next Community Healing Circle. Help shape the future of Buchanan Street Mall Read on... -
Buchanan Street Mall – Park Improvement Equity Action Initiative: First Community Gathering on 3/15
Help shape the future of the Fillmore! Your participation is key for redesigning Buchanan Street Mall Read on... -
LOCATION CHANGE FOR BUCHANAN STREET MALL MEETING THIS EVENING.
LOCATION CHANGE FOR BUCHANAN STREET MALL MEETING THIS EVENING. . . . Read on... -
Memory Walk Design at Buchanan Street Mall - Community Meeting
Core to the community-driven redesign of Buchanan Street Mall, the Memory Walk is envisioned to physically connect all five blocks of the park . . . Read on... -
Buchanan Mall stage preview and last call for the Phase 1 design refinement survey!
Design is progressing for the stage on the McAllister to Fulton block, thanks to the thoughtful input input provided by local performing art stakeholders Read on... -
Buchanan Street Mall Phase 1 – Community Meeting on 2/24/2022
It’s time to CELEBRATE! For seven years, the Western Addition community has dreamed about what Buchanan Mall could become with the right vision and resources. Those dreams are coming true! Read on... -
Buchanan Mall, Turk – Golden Gate at SFAC Civic Design Review Monday 9/20
After almost seven years of community-driven engagement and visioning, SF Rec and Parks is thrilled to be moving forward with a clear schedule for . . . Read on... -
Design continues and additional funding received for Buchanan Street Mall!
Thanks to the 174 people who participated in the survey to refine the design of Buchanan Street Mall, Turk – Golden Gate block. . . Read on... -
Complete the survey to refine the design of an all-ages play area in Buchanan Street Mall
Thanks to everyone who participated in the Virtual Community Meeting . . . Read on... -
Virtual Meeting and Survey to Refine the Design for Buchanan Street Mall
The Buchanan Street Mall project team is seeking community feedback to inform the look and feel and the specific equipment included in the new all-ages recreation area in the Turk - Golden Gate block Read on... -
BUCHANAN STREET MALL FINAL CONCEPTUAL DESIGN COMPLETE!
The Fillmore community has been reimagining Buchanan Street Mall since late 2014, to design a safer more inclusive neighborhood space Read on... -
BUCHANAN STREET MALL – COMMUNITY WORKSHOP ON NOV. 1st!
Please join us on Nov 1st as we begin to create the conceptual design for the entire five block length of Buchanan Mall. Read on... -
DESIGNER SELECTED FOR BUCHANAN MALL
We are excited to have The Office of Cheryl Barton (O|CB) join us as designers for the conceptual design proposals for the entire 5 block length of Buchanan Mall Read on... -
BUCHANAN STREET MALL PROJECT UPDATE
In March 2017, Rec & Park’s partners, the Trust for Public Land (TPL) together with Citizen Film, completed an intensive community engagement process Read on... -
Herz Playground Now Open! | Project update September 2023
Thank you to all of the community members who attended the ribbon cutting ceremony, including our speakers: Mayor London Breed, District 10 Supervisor Shamann Walton Read on... -
Herz Playground Now Open! | Community, City Officials Celebrate $3.38 Million Makeover
Creative new play equipment for kids of all ages and a park makeover inspired by nature greeted families at the renovated Herz Playground in McLaren Park Read on... -
Herz Playground | Reopening Celebration, August 24!
Join us to celebrate the renovation and reopening of Herz Playground on August 24 Read on... -
Herz Rec Center | Project update August 2023
On June 15, our Rec and Park Commission unanimously approved a contract award to SJ Amoroso Construction Co., LLC. to construct the new Herz Rec Center Read on... -
Complete the McLaren Park 2020 Bond Planning priorities survey
We’ve created a new map-based survey to collect your thoughts on possible programming, infrastructure, and connectivity improvements in John McLaren Park. Please take 15-20 minutes Read on... -
Herz Playground | Project update June 2023
We are rounding the corner on progress with Herz Playgound and the space is really taking shape! The play equipment is Read on... -
Herz Playground | Project update May 2023
If you have driven down Visitacion Avenue this week, you may have noticed the large towers erected at the Herz Playground construction site. Read on... -
SF Rec and Park Commission Meeting at Joe Lee Rec Center | March 16 at 10 a.m.
Come meet your Rec and Park Commissioners at our offsite Commission meeting at Joe Lee Rec Center Read on... -
Herz Playground – Construction Update | March 2023
Even with these heavy winter rains, we continue to make progress at Herz Playground. The new sewer lines that serve the Read on... -
Herz Playground – Construction Demolition Almost Complete!
Treaty Construction is busy at work with their backhoe! Demolition is nearly complete at Herz Playground. . . . Read on... -
Herz Playground Groundbreaking Celebration October 24th!
Save the date! Please join, Monday, October 24 from 4:30-5:30 . . . Read on... -
Contract Awarded for Herz Playground Construction
On August 18, 2022, Commission approved that Treaty Construction be awarded the contract to renovate Herz Playground. . . . Read on... -
Bids received for Herz Playground Construction!
Hi everybody- We have great news to share- we received 7 bids on the Herz Playground Renovation Project! Read on... -
Contractor bids are due on Wednesday, May 25! for Herz Playground!
Hi all- We nearing the end of our advertisement period for Herz Playground! . . . Read on... -
Herz Playground Project is going out to bid!
Hi everyone- We will be advertising the Herz Playground Renovation Project this week. . . Read on... -
Herz Playground Project Update March 2022
We have finalized structural engineering for the playground equipment and we aim to bring the construction documents to the Department of Building Inspection Read on... -
Herz Playground Project Update 2/23/2022
We have our final set of drawings and specifications ready for bidding Read on... -
Herz Playground Project Update 1/22!
We are putting the final touches on our permit set of drawings and we are planning to advertise the project to contractors in February. . . Read on... -
Herz Playground Project Update 12/17!
Hi everybody- We have wrapped up our permit set of drawings and the next step is to have the drawings reviewed by the Building Department for approval. . . Read on... -
Herz Playground Project Update 11/18!
Hi everybody- We are putting the finishing touches on the permit set of drawings, which we will submit to the Building Department for approval. . . Read on... -
Herz Playground Project Update 9/20!
Hi everybody- We are getting close to wrapping up our construction document for the new playground and the bathroom renovation at Herz Clubhouse. . . Read on... -
Herz Playground Project Update 8/20!
The landscape architect is developing the construction documents for the project. . . Read on... -
Herz Playground Project Update 7/19!
Hi everybody, We are continuing work on the construction documents for the project. . . Read on... -
Herz Playground Project Update 6/21!
Hi all, We are wrapping up our cost estimating and we will be moving into construction documents for the playground renovation. . . Read on... -
Herz Playground Project Update 5/21!
Hi all, Our design has completed the detailed design phase and we are currently cost estimating the project and doing regulatory reviews. . . Read on... -
Herz Playground Project Update4/20!
Hi everyone, Thank you so much for your support at the Recreation and Park Commission and for participating in all our community outreach for this project. Read on... -
Herz Playground Project is Going Before the Commission for Approval!!
Hi all, This Thursday, March 18th at 10am, we will be presenting the playground concept plan to the Rec Park Commission . . . Read on... -
News about the Herz Projects!
We are excited to share that Rec Park staff will be presenting the . . . Read on... -
Herz Playground Project Update 1/22!
Hi everyone, We are very close to finalizing our concept plan . . . Read on... -
Herz Playground Project Update Dec '20
We are working with the Historic Preservation team at the Planning Department to review the playground design Read on... -
Herz Playground Project Update 10/29!
Thank you so much to those who joined us for our final community meeting. Read on... -
Herz Playground Project Final Community Meeting!
Join us to see the updated design for Herz. . . Read on... -
Herz Playground Project Update 9/18!
Hi all- Our project designers have been updating the playground design to reflect the survey results on the play equipment Read on... -
Herz Playground Project Update 8/21!
Hi all- Thank you so much to everyone who participated in our online survey! Read on... -
Herz Rec Center Project Update 8/21!
Hi everyone! Thanks to those who participated in our focus group meetings. . . Read on... -
Herz Playground Project Survey Still Open!
We have had a great response to our survey and we are going to keep it open a little longer . . . Read on... -
Take a Brief Survey to Help Us with the Herz Playground Renovation!
During these times of civil unrest, we hope that parks can provide essential spaces for gathering, recreating and connecting to nature. Read on... -
Herz Playground Project Update 5/22
We are putting finishing touches on our playground survey and getting it translated into multiple languages. Read on... -
-
HERZ PLAYGROUND
The project team is refining the draft concept plan for the playground and getting a preliminary concept estimate done Read on... -
HERZ- CHILDREN’S PLAYGROUND RENOVATION
Rec Park is working with our project landscape architect to consolidate the community feedback into one design for the playground renovation Read on... -
HERZ PLAYGROUND- WORKING ON THE CONCEPT DESIGN
Thank you so much to those who have provided feedback on our different design options for the Herz Playground Renovation Read on... -
Richmond Playground | Construction update September 2023
Construction work for Richmond Playground will begin soon and includes a complete renovation of the children’s play area with new Read on... -
Richmond Playground | Project update June 2023
We’re looking forward to starting construction at Richmond Playground later this year. The project will feature a complete renovation of Read on... -
Richmond Playground Construction Update 8/17.
We’re almost at 100% completion of the construction drawings . . . Read on... -
Richmond Playground Project Update April 2022
Richmond Playground is moving forward! Read on... -
Richmond Playground Project Update 8/20!
Design work for the Richmond Playground renovation has resumed! Read on... -
Richmond Playground Project Update 4/26!!
Design work on the Richmond Playground renovation is temporarily halted but we are hopeful that the project can resume shortly . . . Read on... -
Richmond playground Project Update 2/9!
The concept design for Richmond Playground is complete! Read on... -
Richmond Playground Concept Design Moving Forward 9/21!
Thank you so much to all who attended the third and final community workshop and to all who have contributed feedback along the way. . . Read on... -
Join us to discuss the final concept design for Richmond Playground!
Please join us for a final community meeting to celebrate and discuss the final concept design for the upcoming renovation . . . Read on... -
Richmond Playground Open House and Design Workshop
Give your input on concept designs for the upcoming renovation of the play area at Richmond Playground Read on... -
Richmond Playground Open House- Thank You!
We had a wonderful Public Open House on November 2nd! About 50 people stopped by on a sunny Saturday morning to participate in the project Read on... -
Richmond Playground Open House
Recreation and Parks hosted an Open House in November 2019 regarding the upcoming renovation of the play area at Richmond Playground Read on... -
Stern Grove Playground Renovation | March 2023 update
As a quick update on the Stern Grove Playground Renovation, we are making some refinements to the final concept design, while continuing regulatory and construction bid preparation Read on... -
Stern Grove Playground Renovation | February 2023 update
We are wrapping up our construction documentation for the playground renovation at Stern Grove... Read on... -
Stern Grove Playground Virtual Community Meeting #3 12/14 at 5pm!
Join us for the third community meeting for the Stern Grove Playground Renovation Project. . . Read on... -
Stern Grove Playground Virtual Community Meeting #2 (7/21 at 5pm)
Join us for the second community meeting for the Stern Grove Playground Renovation Project. . . Read on... -
POSTPONED - Stern Grove Virtual Community Meeting 3/25 at 5 pm!
Join us for the second community meeting for . . . Read on... -
Stern Grove Virtual Community Meeting 2/18 at 5 pm!
We hope you can join us for the first of many virtual meetings to discuss the renovation of the playground at Stern Grove. . . Read on... -
Stern Grove Playground Survey is Now Closed Thank you!
The Stern Grove Playground Community Survey is now open! Read on...
The Task Force
The Task Force, which was appointed by the Recreation and Park Commission on April 17, 2014, includes a Rec Park Commissioner, leaders from children’s advocacy and parent organizations, children and family service organizations, and citywide open space organizations along with volunteers from the Parks, Recreation and Open Space Advisory Committee (PROSAC) and RPD’s GreenAgers program.
The Task Force met seven times and included substantial public participation. After much discussion and analysis, the Task Force unanimously approved a list of 13 playgrounds to be prioritized for renovation, divided into two tiers. The Task Force recommends that all playgrounds containing Chromated Copper Arsenate (CCA) Pressure-Treated Wood be first prioritized for renovation. The division of such playgrounds into Tiers was based on low Household Median Income (HMI), high Youth Density, and low Parks Alliance Report Card grades.
The Task Force was challenged to identify criteria for Failing Playgrounds and apply it to playgrounds throughout the city. The Task Force made recommendations to the Recreation and Park Commission on playgrounds to prioritize for future renovations. Criteria that the Task Force considered included the following:
- 2010 Census Data
- Analysis of disabled access
- Controller’s Office Proposition C evaluation data
- Evaluation of open space and playground deficient neighborhoods
- Parks Alliance Playground Report Card
- The Physical Condition of the Sites
- Presence of Pressure-Treated Lumber
- San Francisco Unified School District playground locations
Bond Report
View the full Bond Report (PDF).
Key Documents
- Draft Map of Final Playgrounds (PDF)
- Final Playgrounds Prioritized for Renovation (PDF)
- Item 10 LetsPlaySF Commission Update Staff Report_FINAL 031821
- Item 10 LetsPlaySF Staff Report 031617
- Item 10 LetsPlaySF! 8.17.17 Commission Update Staff Report 081717
- Item 11 LetsPlaySF Commission Update Staff Report 031722
- Item 11 LetsPlaySF Final Staff Report 081618
- Item 11 LetsPlaySF!_Staff Report 031518
- Item 13 LetsPlaySF Commission Update staff report_09.19.2019
- Item 5E LetsPlaySF! -- Final Map of Playgrounds Task Force Recommendations 111617
- Item 5J Community Opportunity Fund - Parthership Projects Fund Staff Report 061517
- Item 7 LetsPlay Staff Report 121516
- Item 7 LetsPlaySF Commission Update Staff Report FINAL 081921
- Item 7 LetsPlaySF! Staff Report 082020
- Item 8 Failing Playgrounds Task Force Report Staff Report 121814
- Item 8 LetsPlaySF Commission Update_1 Staff Report 091522
- Item 9 LetsPlaySF Commission Update staff report 032119
- LetsPlaySF Commission Update Final Staff Report_May 2020
- Map of Playgrounds Prioritized for Renovation (PDF)
- Map of Potential Playgrounds (CPAs) for Future Renovations (PDF)
- Task Force Final Report (PDF)
Task Force Meeting Number 1
- 2012 Playground Report Card (PDF) (SF Parks Alliance)
- 2014 Playground Assessment Tool (PDF) (SF Parks Alliance)
- 2014 Playground Reassessment Report (PDF) (SF Parks Alliance)
- City and County of San Francisco Controller's City Survey Report - Parks and Recreation Chapter (PDF)
- Failing Playground Task Force Goals (PDF)
- Failing Playgrounds Task Force Meeting Number 1 Notes (PDF)
- Meeting 1 Presentation (PDF)
- Proposed Task Force Workplan by Meeting (PDF)
- RPD Park Maintenance Standards PES4 Evaluation Form - Children Play Areas (PDF)
- Task Force Meeting Number 1 Agenda (PDF)
Task Force Meeting Number 2
- Anatomy of a Playground (PDF)
- Failing Playgrounds Task Force Meeting 2 Notes (PDF)
- Task Force Meeting Number 2 Agenda (PDF)
- Task Force Meeting Schedule (PDF)
- Work Orders related to surveyed Children's Play Areas (Playgrounds) (PDF)
Task Force Meeting Number 3
- Failing Playgrounds Task Force Meeting 3 Notes (PDF)
- Map Number 1 All Playgrounds (Childrens' Play Areas) Citywide (PDF)
- Map Number 2 Recently Renovated Playgrounds (Childrens' Play Areas) (PDF)
- Map Number 3 Potential Playgrounds (Children's Play Areas) for Future Renovations (PDF)
- Proposed Tiering of Priority Playground Projects (PDF)
- Task Force Meeting Number 3 Agenda (PDF)
Task Force Meeting Number 4
- Failing Playgrounds Task Force Meeting 4 Notes (PDF)
- Tableau Failing Playgrounds Maps and Analysis
- Task Force Meeting Number 4 Agenda (PDF)
Task Force Meeting Number 5
- Draft Proposed Alternatives Presented at Meeting 5 (PDF)
- Failing Playgrounds Task Force Meeting 5 Notes (PDF)
- Maps Presented at Meeting 5 (PDF)
- Playground Profiles Presented at Meeting 5 (PDF)
- Task Force Meeting Number 5 Agenda (PDF)
Task Force Meeting Number 6
- Combined updated Playgrounds Profile List (PDF)
- Draft Final Playgrounds List (PDF)
- Draft Map of Final Playgrounds (PDF)
- Failing Playgrounds Task Force Meeting 6 Notes (PDF)
- Meeting 6 Final Presentation (PDF)
Task Force Meeting Number 7
- Katie Albright
Executive Director
San Francisco Child Abuse Prevention Center - Julia Brashares
Director of Street Parks
SF Parks Alliance - Chelsea Boilard
Director of Programs
Coleman Advocates - Alejandra Chiesa
Project Manager - Parks for People
Trust for Public Land - Rob Connolly
President
Boys and Girls Club of San Francisco - Anthony Cuadro
D7 Representative
PROSAC - Dawn Kamalanathan
Director of Planning and Capital Management
SF Recreation and Park Department - Eric McDonnell
Commissioner
Recreation and Parks Commission - Doreen Pacini
Youth Representative
GreenAgers - Albert Ko
Executive Vice President
SF Parent Teacher Association - Michelle Parker
VP Communications
SF Parent Teacher Association - Mario Paz
Executive Director
Good Samaritan Family Resource Center - Mark Scheuer
D8 Representative
PROSAC - Lee Anne Weldon
Council Member, Policy Council
SF Parks Alliance
-
Kelli Rudnick
Project Manager Supervisor