Youngblood Coleman Synthetic Turf Replacement

Youngblood Coleman FieldDescription

This project was completed in January 2021. Prior to this turf replacement project, it had been over ten years since the last time synthetic turf was installed at the Youngblood Coleman soccer field and the field was at the end of its useful life.

Scope of Work

Replaced turf, turf infill, and turf underlayment pads; drainage improvements; lighting improvements; improvements and repairs to the existing perimeter fence and gate systems; replaced select site furnishings.

Funding Source

Funding came from the Recreation and Parks Department General Fund and Playfields Fund.

  1. Capital Project Update

    Construction Update JAN 2020

    Contractors have begun removing the old synthetic turf and infill at the soccer field Read on...
  2. Capital Project Update

    Construction Award Update

    The construction contract for this project has been awarded to Robert A. Bothman Construction Corporation and Yerba Buena Engineering Read on...
  3. Capital Project Update

    Preparing to Bid

    We are in the home stretch of preparing the bid package and plan to put this project out to bid Read on...
  4. Capital Project Update

    Design Underway OCT 2018

    Verde Design, Inc. is moving along with the design of this project Read on...
  1. Monica Scott

    Project Manager
    Phone: 1-628-652-6632